LESCO New Connection – Meter Replacement

How to Apply for a New LESCO Connection: Step-by-Step Guide

How to Apply For LESCO New Connection By Using ENC?

It is always necessary to understand Lesco’s supply criteria and provide the correct documentation to apply for a LESCO new connection. Make sure you follow the official application steps and fulfill all requirements in advance for a smooth, fast, and hassle-free approval process.

Key Subdivision Information For LESCO New Connection

Distribution Type

This indicates the availability of electrical distribution in the area where you are applying for WAPDA electricity connection. This section also explains the type of electricity supply you are applying for, such as domestic, commercial, or industrial. 

Category Type

The category type shows the connection capacity based on usage or load, for example 1 kWh or 3 kWh. Each category has different requirements, approval conditions, and electricity rates.

Sub Division

This section defines the installation area within LESCO’s service zone. It ensures your application reaches the appropriate division. This supports timely approval.

Neighbor’s Reference Number

The reference number of an existing nearby LESCO connection helps confirm the location of the new applicant. It streamlines verification. This minimizes delays.

Category-Wise Steps For Lesco New Connection

LESCO provides new electricity connections according to the consumer’s required load and voltage level. Every category follows a separate application and approval process. Each category is explained below in simple terms.

Category One – (up to 15kW)

This category is specific to residential users and small commercial setups like homes and shops. This category requires basic documents such as CNIC, property proof, and a wiring test report. After verification of the process, Lesco installs the new WAPDA connection once the payment is made.

Category Two – (16kW to 70kW / 400 Volts)

This category covers medium commercial and industrial connections. Load details and wiring diagrams are required. The meter is installed after inspection and payment.

Category Three – (71kW to 500kW / 400 Volts)

This category is applicable to high-demand industrial electricity connections under LESCO. It involves detailed technical approvals and may require transformer installation. The connection is installed after Demand Notice payment.

Connection Types

LESCO offers different types of electricity connections based on the purpose and load requirements. Selecting the correct connection type ensures proper billing, meter installation, and service reliability.

Domestic

Choose this option for residential households, including homes and apartments, with low to moderate electricity consumption.

Commercial

Choose this option if you want to apply for a new Meter connection for shops, offices, schools, and small businesses requiring moderate load and regular supply.

Industrial

Hit this option if you need a new electricity connection for factories, workshops, and large-scale industrial units with high electricity demand.

Agriculture

Click on this option for farms, irrigation systems, and agricultural operations, including tube wells and pumps.

Tube Well

It is a dedicated connection for tube wells used in farming, with the load calculated based on motor capacity.

Temporary

Select this option if you are planning for short-term electricity requirements, such as events, exhibitions, or construction sites.

Street lights

This option is used for municipal or private street lighting projects, ensuring continuous public lighting.

General Services

For government offices, institutions, or community service points needing standard electricity supply, this option is used.

Electrification (Colonies)

This selection is made where residential colonies or housing schemes often involve multiple connections and network extension.

Corporate Companies

This refers to a WAPDA Electricity Connection for large companies or corporate offices with high and consistent power needs, often requiring special metering and tariff.

Applicant’s Particulars

Applicants must indicate their status as owner or tenant in this section. Then provide full name, father’s name, CNIC number, current address, and two working mobile numbers. Click OK once all details are complete to proceed with the application.

Contact Person Information

This section captures the contact details of a responsible person to facilitate LESCO’s communication during the new connection process. Ensure all information is correct and active for faster processing.

  • Contact Person Name: Enter the full name of the contact person who will coordinate with LESCO regarding your new connection.
  • Mobile no: Provide an active mobile number so LESCO can contact you for updates, inspections, or additional requirements.
  • Present Address: Mention the current residential or business address of the contact person for record and verification purposes.
  • Relationship with Applicant: Specify the relationship of the contact person with the applicant, such as self, brother, manager, or authorized representative.
  • Email: Enter a valid email address to receive official notifications, status updates, and important communication related to the LESCO new connection application.

Premises Detail

This section captures essential information about the premises where the LESCO new electricity connection is required. LESCO assesses load requirements and verifies the location efficiently by providing accurate premises details. 

  • No. of meters already installed: You have to mention the total number of electricity meters already installed at the premises, if any. This helps LESCO check existing connections and avoid duplication.
  • Minimum Load(In KWh):Must enter the estimated minimum electricity load in kWh required for the premises. This information is used to determine the appropriate connection category and meter type.
  • Premises Address: Provide the complete and correct address of the premises, including street, area, and nearby landmarks. This will ensure proper site identification and timely inspection by LESCO.

Lesco New Connection Charges and Fee

LESCO’s new connection charges depend on the connection type and sanctioned load. A single-phase residential connection costs up to Rs. 21,000, while a three-phase connection may start from Rs. 63,000 or more. The final amount is specified in the LESCO Demand Notice and must be paid before meter installation.

Documents required for new Lesco connection

It is essential to gather all necessary documents before applying for a LESCO electricity connection. Submitting the correct documents is mandatory for a smooth new electricity connection process. It will ensure timely approval and meter installation. Here’s a list of all required documentation for all types of connections. Just have a look!

Residential / Domestic Connection

  • Copy of the CNIC of the applicant
  • Proof of ownership (property ownership document or rent agreement)
  • Site plan or layout of the premises
  • Wiring test report from a licensed electrician
  • Recent utility bill (if applicable, for verification)

For Commercial Connection

  • Copy of CNIC of the applicant or authorized person
  • Business registration document or proof of commercial activity
  • Ownership proof (lease agreement or property documents)
  • Electrical load details and wiring diagram
  • Wiring test report from a licensed electrician
  • Site layout plan

Industrial Connection

  • Copy of CNIC of the applicant or authorized person
  • Industrial registration certificate or proof of company incorporation
  • Technical drawings, including electrical designs and protection schemes
  • Load schedule/estimation
  • Feasibility report (if required by LESCO for high-load connections)
  • Ownership or lease proof of the premises
  • Wiring test report from a licensed electrician

Agriculture / Tube Well Connection

  • Copy of the CNIC of the applicant
  • Land ownership document
  • Pump capacity/load details
  • Wiring diagram (if required)
  • Site map

Temporary, Street Light, and General Services

  • Copy of CNIC of the applicant or the responsible person
  • Permission letter from local authorities (for street lights or temporary supply)
  • Load estimation
  • Wiring plan, if applicable

Timeframe for Lesco New Connection

The processing period for a New Lesco connection depends on the type of connection you are applying for. Domestic connections are usually completed within 7 to 15 working days, whereas commercial and industrial connections may take longer and sometimes up to 30 working days. This is due to some requirements such as inspections, technical checks, and network upgrades. 

LESCO NEW Connection Tracking

You can track your application for a new connection online or via the Lesco helpline. You can know whether your application is under verification, approved, or pending meter installation. For this process, you only need your Reference No. and your CNIC in your hands, as it will make the tracking process faster and easier. Just visit  https://enc.com.pk/track_application.

Conclusion

Getting a LESCO new connection is now straightforward with clear guidelines for connection types, required documents, and fees. You can avoid delays and get faster service by providing accurate information and paying the Demand Notice on time . Online tracking lets you monitor your application. So, there’s no need for frequent visits to the LESCO office. Meter replacement can also be requested to ensure accurate billing and a safe electricity supply.