LESCO New Connection – Meter Replacement
You have built a new house or changed your current residence, and are worried about the new Lesco electricity connection. You are thinking about trouble by waiting in long lines to get your new Lesco connection. You are lucky, because in this guide, we shall show you the complete step-by-step process of how to get a new WAPDA Electricity Connection. It’s important to understand the process of getting a new connection. Lesco is providing this facility through an online portal. The process is very simple and quick. Just visit “https://enc.com.pk/”. You can also access the ENC portal, as it helps get customer support and other related inquiries
How to Apply for a New LESCO Connection: Step-by-Step Guide
- Step 1: Visit “https://enc.com.pk/” to file your application form.
- Step 2: You will be asked to input your correct information relatively.
- Step 3: Upload all necessary documents and provide the required information for further proceedings.
- Step 4: You will need to print out your submitted information form for proof-reading.
- Step 5:Upload the following scanned documents: Property Document Copy, Attested, CNIC Copy of Applicant Attested, CNIC Copy of Witness, Neighbor LESCO Bill Copy, Wiring Contractor`s Test Report (not exceeding 300KB file size and in JPG/PDF format)
- Step 6: Attach all your required documents to your printed application.
- Step 7:Submit the complete application file, including all required documents and the filled application form, to the relevant LESCO office for verification and further processing.
- Step 8: After verification of your application form, LESCO will issue you a demand notice for your new meter connection.
- Step 9 :You must deposit the Demand Notice amount in the prescribed bank as instructed by LESCO.
- Step 10: After paying the Demand Notice (DN), collect the bank receipt and keep it safe, as the original must be shown to the concerned LESCO department for further processing.
- Step 11:LESCO is responsible for installing the new electricity connection once the application and documents have been successfully verified. Applicants should patiently wait for the installation within the timeframe provided by LESCO.
How to Apply For LESCO New Connection By Using ENC?
It is always necessary to understand Lesco’s supply criteria and provide the correct documentation to apply for a LESCO new connection. Make sure you follow the official application steps and fulfill all requirements in advance for a smooth, fast, and hassle-free approval process.
Key Subdivision Information For LESCO New Connection
Distribution Type
This indicates the availability of electrical distribution in the area where you are applying for WAPDA electricity connection. This section also explains the type of electricity supply you are applying for, such as domestic, commercial, or industrial.
Category Type
The category type shows the connection capacity based on usage or load, for example 1 kWh or 3 kWh. Each category has different requirements, approval conditions, and electricity rates.
Sub Division
This section defines the installation area within LESCO’s service zone. It ensures your application reaches the appropriate division. This supports timely approval.
Neighbor’s Reference Number
The reference number of an existing nearby LESCO connection helps confirm the location of the new applicant. It streamlines verification. This minimizes delays.
Category-Wise Steps For Lesco New Connection
LESCO provides new electricity connections according to the consumer’s required load and voltage level. Every category follows a separate application and approval process. Each category is explained below in simple terms.
Category One – (up to 15kW)
This category is specific to residential users and small commercial setups like homes and shops. This category requires basic documents such as CNIC, property proof, and a wiring test report. After verification of the process, Lesco installs the new WAPDA connection once the payment is made.
Category Two – (16kW to 70kW / 400 Volts)
This category covers medium commercial and industrial connections. Load details and wiring diagrams are required. The meter is installed after inspection and payment.
Category Three – (71kW to 500kW / 400 Volts)
This category is applicable to high-demand industrial electricity connections under LESCO. It involves detailed technical approvals and may require transformer installation. The connection is installed after Demand Notice payment.
Connection Types
LESCO offers different types of electricity connections based on the purpose and load requirements. Selecting the correct connection type ensures proper billing, meter installation, and service reliability.
Domestic
Choose this option for residential households, including homes and apartments, with low to moderate electricity consumption.
Commercial
Choose this option if you want to apply for a new Meter connection for shops, offices, schools, and small businesses requiring moderate load and regular supply.
Industrial
Hit this option if you need a new electricity connection for factories, workshops, and large-scale industrial units with high electricity demand.
Agriculture
Click on this option for farms, irrigation systems, and agricultural operations, including tube wells and pumps.
Tube Well
It is a dedicated connection for tube wells used in farming, with the load calculated based on motor capacity.
Temporary
Select this option if you are planning for short-term electricity requirements, such as events, exhibitions, or construction sites.
Street lights
This option is used for municipal or private street lighting projects, ensuring continuous public lighting.
General Services
For government offices, institutions, or community service points needing standard electricity supply, this option is used.
Electrification (Colonies)
This selection is made where residential colonies or housing schemes often involve multiple connections and network extension.
Corporate Companies
This refers to a WAPDA Electricity Connection for large companies or corporate offices with high and consistent power needs, often requiring special metering and tariff.
Applicant’s Particulars
Applicants must indicate their status as owner or tenant in this section. Then provide full name, father’s name, CNIC number, current address, and two working mobile numbers. Click OK once all details are complete to proceed with the application.
Contact Person Information
This section captures the contact details of a responsible person to facilitate LESCO’s communication during the new connection process. Ensure all information is correct and active for faster processing.
- Contact Person Name: Enter the full name of the contact person who will coordinate with LESCO regarding your new connection.
- Mobile no: Provide an active mobile number so LESCO can contact you for updates, inspections, or additional requirements.
- Present Address: Mention the current residential or business address of the contact person for record and verification purposes.
- Relationship with Applicant: Specify the relationship of the contact person with the applicant, such as self, brother, manager, or authorized representative.
- Email: Enter a valid email address to receive official notifications, status updates, and important communication related to the LESCO new connection application.
Premises Detail
This section captures essential information about the premises where the LESCO new electricity connection is required. LESCO assesses load requirements and verifies the location efficiently by providing accurate premises details.
- No. of meters already installed: You have to mention the total number of electricity meters already installed at the premises, if any. This helps LESCO check existing connections and avoid duplication.
- Minimum Load(In KWh):Must enter the estimated minimum electricity load in kWh required for the premises. This information is used to determine the appropriate connection category and meter type.
- Premises Address: Provide the complete and correct address of the premises, including street, area, and nearby landmarks. This will ensure proper site identification and timely inspection by LESCO.
Lesco New Connection Charges and Fee
LESCO’s new connection charges depend on the connection type and sanctioned load. A single-phase residential connection costs up to Rs. 21,000, while a three-phase connection may start from Rs. 63,000 or more. The final amount is specified in the LESCO Demand Notice and must be paid before meter installation.
Documents required for new Lesco connection
It is essential to gather all necessary documents before applying for a LESCO electricity connection. Submitting the correct documents is mandatory for a smooth new electricity connection process. It will ensure timely approval and meter installation. Here’s a list of all required documentation for all types of connections. Just have a look!
Residential / Domestic Connection
- Copy of the CNIC of the applicant
- Proof of ownership (property ownership document or rent agreement)
- Site plan or layout of the premises
- Wiring test report from a licensed electrician
- Recent utility bill (if applicable, for verification)
For Commercial Connection
- Copy of CNIC of the applicant or authorized person
- Business registration document or proof of commercial activity
- Ownership proof (lease agreement or property documents)
- Electrical load details and wiring diagram
- Wiring test report from a licensed electrician
- Site layout plan
Industrial Connection
- Copy of CNIC of the applicant or authorized person
- Industrial registration certificate or proof of company incorporation
- Technical drawings, including electrical designs and protection schemes
- Load schedule/estimation
- Feasibility report (if required by LESCO for high-load connections)
- Ownership or lease proof of the premises
- Wiring test report from a licensed electrician
Agriculture / Tube Well Connection
- Copy of the CNIC of the applicant
- Land ownership document
- Pump capacity/load details
- Wiring diagram (if required)
- Site map
Temporary, Street Light, and General Services
- Copy of CNIC of the applicant or the responsible person
- Permission letter from local authorities (for street lights or temporary supply)
- Load estimation
- Wiring plan, if applicable
Timeframe for Lesco New Connection
The processing period for a New Lesco connection depends on the type of connection you are applying for. Domestic connections are usually completed within 7 to 15 working days, whereas commercial and industrial connections may take longer and sometimes up to 30 working days. This is due to some requirements such as inspections, technical checks, and network upgrades.
LESCO NEW Connection Tracking
You can track your application for a new connection online or via the Lesco helpline. You can know whether your application is under verification, approved, or pending meter installation. For this process, you only need your Reference No. and your CNIC in your hands, as it will make the tracking process faster and easier. Just visit https://enc.com.pk/track_application.
Conclusion
Getting a LESCO new connection is now straightforward with clear guidelines for connection types, required documents, and fees. You can avoid delays and get faster service by providing accurate information and paying the Demand Notice on time . Online tracking lets you monitor your application. So, there’s no need for frequent visits to the LESCO office. Meter replacement can also be requested to ensure accurate billing and a safe electricity supply.